Commercial kitchen design process----CNS Commercial kitchenware
2024-09-25    VISITS:

First, early consultation


      Customers consult designers for decoration design style, cost, cycle, etc.


Second, on-site measurement room


      By the designer to the customer to decorate the space on-site survey, and a comprehensive investigation, in order to more scientific and reasonable decoration design.


(1) Quantitative measurement: measure the length and width of the space, and calculate the different space area for each use.


(2) Positioning measurement: mainly indicate the position and quantity of doors and Windows.


(3) Height measurement: mainly measure the height of each space.


3. Design contract


      Under the premise of mutual communication and confirmation, sign the design contract to clarify the rights and obligations of both parties.


Fourth, design the first


      Deliver the first payment of design according to the design contract.


5. Design phase


      After the preliminary negotiation and preparation, according to the design style chosen by the customer, the design team enters the design phase.


6. Plan confirmation


      According to customer feedback,Z finally determined the design scheme (plane, effect drawing, construction drawing) and related budget, and signed by the customer.


Seven, design the end


      The final payment of the design shall be delivered according to the design contract.


8. Construction contract


      Under the premise of both parties' confirmation of the design plan and budget, the kitchen construction contract is signed to clarify the rights and obligations of both parties.

6b9e3a6b7ca03b96e3f76f6d85a4497.png

Commercial kitchenware

Nine, construction of the first


      The first installment of kitchen works shall be delivered in accordance with the contract.


10. Construction phase


      After the preliminary negotiation and preparation, the project team entered the construction stage.


11. Interim acceptance


      Acceptance of concealed works and individual works, such as carpentry, water and electricity, etc.


12. Pay interim payment


      Pay the interim payment agreed in the contract and the project change payment.


13. Completion acceptance


      Customer, designer, project supervisor, construction person in charge to participate in the acceptance signed confirmation.


14. Pay the balance


      Pay all remaining funds according to the actual occurrence of the project and service.


15. Project maintenance


      According to the contract, the company is responsible for the maintenance of the project within a certain period of time.

760cbcc235e62414cbf03c11492ce78.png

      If you need to buy Commercial kitchenware equipment, feel free to contact us, we will provide you with a high quality complete solution!